XIII: The Claimants’ Trust witnesses [74]-[94]
XIII: The Claimants’ Trust witnesses [74]-[94]
The Claimants called two witnesses with roles in positions above EuroChem AG in the ownership structure, who therefore were in a position to say something about the Firstline Trust. They were both markedly less satisfactory than the other witnesses.
- Heading
- PART A: INTRODUCTION AND PARTIES [1]-[22]
- II: The Claimants [11]-[17]
- III: The Banks and Tecnimont [18]-[20]
- IV: The new Kingisepp plant [21]-[22]
- PART B: THE BONDS AND EUROCHEM NW2’S DEMANDS [23]-[45]
- VI: Designation under Regulation 269 [29]-[33]
- VII: Termination of the Contracts [34]-[37]
- VIII: EuroChem NW2’s demands on the Bonds [38]-[40]
- IX: Rejection of the demands [41]-[45]
- PART C: THE ISSUES AND THE WITNESSES [46]-[98]
- XI: The Claimants’ EuroChem AG witnesses [59]-[66]
- Mr Valters and Mr Solzhenitsyn
- Mr Hechler
- Mr Collishe
- Ms Basyrova
- XII: The Claimants’ EuroChem NW2 witness [67]-[73]
- XIII: The Claimants’ Trust witnesses [74]-[94]
- Mr Fokin
- Mr Noble
- XIV: The Banks’ witnesses [95]-[98]
- PART D: THE FACTS RE OWNERSHIP AND CONTROL [99]-[211]
- The Trusts above EuroChem AG
- The structure from EuroChem AG downwards
- XVI: The ownership structure after sanctions [110]-[123]
- Changes at the level of EuroChem AG
- Changes in directorships
- XVII: Other group structural changes [124]-[144]
- The “Future of EuroChem” memorandum
- The transfers to MCC EuroChem
- The UAE trading cluster
- Changes within EuroChem AG and the EU subsidiaries
- XVIII: Mr Melnichenko’s involvement before March 2022 [145]-[151]
- XIX: The Claimants’ first pleading point [152]-[154]
- XX: The date of the Deed of Retirement [155]-[165]
- XXI: The role of Mrs Melnichenko [166]-[175]
- XXII: Mr Melnichenko’s involvement after March 2022 (1) [176]-[187]
- XXIII: The Claimants’ second pleading point [188]-[197]
- XXIV: Mr Melnichenko’s involvement after March 2022 (2) [198]-[204]
- XXV: The Assignment [205]-[211]
- PART E: REGULATION 269 [212]-[305]
- XXVII: The supplementary EU materials [220]-[225]
- XXVIII: Decisions of the CJEU [226]-[229]
- XXIX: How to interpret Regulation 269 [230]-[240]
- XXX: Article 2(1) [241]-[248]
- XXXI: Article 2(2) [249]-[259]
- XXXII: “Ownership” [260]-[278]
- XXXIII: The Claimants’ third pleading point [279]-[282]
- XXXIV: The MP Bank v Pugachev point [283]-[293]
- XXXV: “Control” [294]-[305]
- PART F: THE NCAS [306]-[347]
- XXXVII: Firewalls and the NCAs [312]-[313]
- XXXVIII: The French NCA: the DGT [314]-[326]
- XXXIX: The Italian NCA: the CSF [327]-[332]
- XL: The Swiss NCA: the SECO [333]-[337]
- XLI: The Cypriot NCA: the SEOK [338]-[341]
- XLII: The Dutch NCA: the BTI [342]-[347]
- PART G: APPLYING REGULATION 269 [348]-[411]
- XLIV: Inferences [360]-[369]
- XLV: Article 2(1) and the Bonds [370]-[378]
- XLVI: The LIA v Maud point [379]-[399]
- XLVII: Article 2(1) and the Assignment [400]
- XLVIII: Article 2(2) and payment to EuroChem NW2 [401]-[403]
- XLIX: Article 2(2) and payment to EuroChem AG [404]-[408]
- L: The pending applications to the DGT and the CSF [409]-[411]
- PART H: REGULATION 833 [412]-[473]
- LII: Are the claims “in connection with” the Contracts? [416]-[429]
- LIII: Are the claims by or on behalf of a Russian entity? [430]-[433]
- LIV: Conclusion on Regulation 833 [434]-[435]
- PART I: THE RULE IN RALLI BROTHERS [436]-[473]
- LVI: The rule in Ralli Brothers [438]-[440]
- LVII: The place of performance under the Bonds [441]-[461]
- LVIII: Licence applications and Article 7 [462]-[465]
- LIX: Public policy [466]-[470]
- LX: Implied term [471]-[472]
- LXI: Conclusion on the rule in Ralli Brothers [473]
- PART J: OTHER ARGUMENTS [474]-[494]
- LXIII: The Bonds’ expiry dates [476]-[478]
- LXIV: Validity of the Assignment [479]-[482]
- LXV: The Assignment and Article 9 [483]-[486]
- LXVI: The sanctioned Russian banks [487]-[491]
- LXVII: ING’s Part 20 claim against Tecnimont [492]-[494]
- Conclusions
![CL-2022-000456 - [2025] EWHC 1938 (Comm)](https://backend.juristeca.com/files/emisores/logo_WAai98v.png)