XLIX: Article 2(2) and payment to EuroChem AG [404]-[408]
XLIX: Article 2(2) and payment to EuroChem AG [404]-[408]
In the light of my conclusion that the Assignment has no effect, because there are and can be no proceeds under the Bonds, this is academic.
If that were not the case, Article 2(2) would not prevent payment to EuroChem AG. This follows from the fact that the SECO – as the NCA where EuroChem AG is incorporated – has approved EuroChem AG’s firewall. This determination has been noted and expressly followed in France, by the DGT, as well as in other countries such as Cyprus and the Netherlands.
The position of the CSF in Italy in relation to the firewall has not been expressly stated, because the CSF’s message of 28 April 2025 focusses solely on the fact that the premise of this hypothesis is invalid. That message simply confirms that the Bonds are frozen, being part of EuroChem NW2’s funds/economic resources; which means that the Assignment has no effect.
Thus far, the CSF has not said clearly whether it accepts EuroChem AG’s firewall measures. I suspect that this is because the CSF, rightly, considers that to be a determination to be made by the SECO.
In any event, I accept the Claimants’ evidence as to the firewall. This means (among other things) that the presumption that would otherwise arise under Article 2(2) is displaced, as regards EuroChem AG.
- Heading
- PART A: INTRODUCTION AND PARTIES [1]-[22]
- II: The Claimants [11]-[17]
- III: The Banks and Tecnimont [18]-[20]
- IV: The new Kingisepp plant [21]-[22]
- PART B: THE BONDS AND EUROCHEM NW2’S DEMANDS [23]-[45]
- VI: Designation under Regulation 269 [29]-[33]
- VII: Termination of the Contracts [34]-[37]
- VIII: EuroChem NW2’s demands on the Bonds [38]-[40]
- IX: Rejection of the demands [41]-[45]
- PART C: THE ISSUES AND THE WITNESSES [46]-[98]
- XI: The Claimants’ EuroChem AG witnesses [59]-[66]
- Mr Valters and Mr Solzhenitsyn
- Mr Hechler
- Mr Collishe
- Ms Basyrova
- XII: The Claimants’ EuroChem NW2 witness [67]-[73]
- XIII: The Claimants’ Trust witnesses [74]-[94]
- Mr Fokin
- Mr Noble
- XIV: The Banks’ witnesses [95]-[98]
- PART D: THE FACTS RE OWNERSHIP AND CONTROL [99]-[211]
- The Trusts above EuroChem AG
- The structure from EuroChem AG downwards
- XVI: The ownership structure after sanctions [110]-[123]
- Changes at the level of EuroChem AG
- Changes in directorships
- XVII: Other group structural changes [124]-[144]
- The “Future of EuroChem” memorandum
- The transfers to MCC EuroChem
- The UAE trading cluster
- Changes within EuroChem AG and the EU subsidiaries
- XVIII: Mr Melnichenko’s involvement before March 2022 [145]-[151]
- XIX: The Claimants’ first pleading point [152]-[154]
- XX: The date of the Deed of Retirement [155]-[165]
- XXI: The role of Mrs Melnichenko [166]-[175]
- XXII: Mr Melnichenko’s involvement after March 2022 (1) [176]-[187]
- XXIII: The Claimants’ second pleading point [188]-[197]
- XXIV: Mr Melnichenko’s involvement after March 2022 (2) [198]-[204]
- XXV: The Assignment [205]-[211]
- PART E: REGULATION 269 [212]-[305]
- XXVII: The supplementary EU materials [220]-[225]
- XXVIII: Decisions of the CJEU [226]-[229]
- XXIX: How to interpret Regulation 269 [230]-[240]
- XXX: Article 2(1) [241]-[248]
- XXXI: Article 2(2) [249]-[259]
- XXXII: “Ownership” [260]-[278]
- XXXIII: The Claimants’ third pleading point [279]-[282]
- XXXIV: The MP Bank v Pugachev point [283]-[293]
- XXXV: “Control” [294]-[305]
- PART F: THE NCAS [306]-[347]
- XXXVII: Firewalls and the NCAs [312]-[313]
- XXXVIII: The French NCA: the DGT [314]-[326]
- XXXIX: The Italian NCA: the CSF [327]-[332]
- XL: The Swiss NCA: the SECO [333]-[337]
- XLI: The Cypriot NCA: the SEOK [338]-[341]
- XLII: The Dutch NCA: the BTI [342]-[347]
- PART G: APPLYING REGULATION 269 [348]-[411]
- XLIV: Inferences [360]-[369]
- XLV: Article 2(1) and the Bonds [370]-[378]
- XLVI: The LIA v Maud point [379]-[399]
- XLVII: Article 2(1) and the Assignment [400]
- XLVIII: Article 2(2) and payment to EuroChem NW2 [401]-[403]
- XLIX: Article 2(2) and payment to EuroChem AG [404]-[408]
- L: The pending applications to the DGT and the CSF [409]-[411]
- PART H: REGULATION 833 [412]-[473]
- LII: Are the claims “in connection with” the Contracts? [416]-[429]
- LIII: Are the claims by or on behalf of a Russian entity? [430]-[433]
- LIV: Conclusion on Regulation 833 [434]-[435]
- PART I: THE RULE IN RALLI BROTHERS [436]-[473]
- LVI: The rule in Ralli Brothers [438]-[440]
- LVII: The place of performance under the Bonds [441]-[461]
- LVIII: Licence applications and Article 7 [462]-[465]
- LIX: Public policy [466]-[470]
- LX: Implied term [471]-[472]
- LXI: Conclusion on the rule in Ralli Brothers [473]
- PART J: OTHER ARGUMENTS [474]-[494]
- LXIII: The Bonds’ expiry dates [476]-[478]
- LXIV: Validity of the Assignment [479]-[482]
- LXV: The Assignment and Article 9 [483]-[486]
- LXVI: The sanctioned Russian banks [487]-[491]
- LXVII: ING’s Part 20 claim against Tecnimont [492]-[494]
- Conclusions