[2024] EWHC 3625 (TCC)
Technology and Construction Court

[2024] EWHC 3625 (TCC)

Fecha: 13-Sep-2024

he failed to allow for other build costs; and

-

he failed to allow for other build costs; and

-

he made no allowance for the Community Infrastructure Levy which the developer was obliged to pay pursuant to the Planning Permission.

-

the valuation of property benefitting from Planning Permission should be on a residual basis and in accordance with the RICS Guidance Note (1st edition, October 2019);

-

the best comparable sales for the subject site were those of the adjoining development, known as Plots A,B and D;

-

Plot C should be valued based on the Planning Permission for 7 dwellings, 2 of which were to be affordable tenure housing;

-

In his determination, Mr Wilson stated that the Planning Permission was for 7 dwellings and that the affordable housing element was offset by a separate payment in lieu of the affordable tenure housing;